![]() ![]() ![]() |
|||||||
|
|
|
Laying the Sod: Lay the sod in brickwork fashion, smoothing the soil in advance of sod laying. Make sure the joints are butted together snugly without overlapping. If laying sod on slopes, lay the slabs perpendicular to the direction of the slope. Use sod staples to secure the sod on steep slopes if necessary. Shaping: Use a sharp knife or spade for shaping the non-rectangular edges and small areas such as flower bed, hedges, etc. Watering: Completely saturate the sodded area when finished. Be sure to soak the entire sod area at the end of each day’s work. |
|||||
|
||||||||
|
||||||||
Saratoga Sod Farm 374 Route 4 · Stillwater, NY 12170 Phone: 518.664.5038 · Fax: 518.664.3559 info@saratogasod.com In-season Office Hours: 7-5 M-F and 8-Noon on Saturday Copyright © Saratoga Sod |